uk
Thejimsproject.org.uk

Thejimsproject is ranked 2,617,614 in the United Kingdom. 'The JIMS Project | Home.'

2,617,614Rank in United Kingdom

22,735,361Worldwide Rank

Monthly pages viewed< 300
Monthly visits< 300
Value per visitor--
Estimated worth£404.81
External links105
Number of pages90

Last Updated: 05/04/2018 . Estimated data, read disclaimer.

Visitors

Traffic History 90 Day Average
Worldwide Rank19,105,34512,326,714
Daily Visitors6 -76.32%
Daily Visitors Rank17,622,04011,023,079
Daily Pageviews0 -85.48%
Daily Pageviews Rank19,998,80112,239,138
Pageviews Per User1.00 -38.65%
Content

www.Thejimsproject.org.uk

Topics: Programmes, The Crew, Acknowledgements, Paint A Pot, and Ramina.

Category: 'Kilkeel/Arts and Entertainment'

On average 1 page are viewed each, by the estimated 7 daily visitors.

LinksServer

Its local IP address is 69.163.178.123. Its 3 nameservers are ns2.dreamhost.com, ns3.dreamhost.com, and ns1.dreamhost.com.

IP: 69.163.178.123

Web Server: Apache

Encoding: utf-8

PING www. (69.163.178.123) 56(84) bytes of data.
64 bytes from apache2-fritz.saprissa.dreamhost.com (69.163.178.123): icmp_seq=1 ttl=56 39.7 ms
64 bytes from apache2-fritz.saprissa.dreamhost.com (69.163.178.123): icmp_seq=2 ttl=56 44.2 ms
64 bytes from apache2-fritz.saprissa.dreamhost.com (69.163.178.123): icmp_seq=3 ttl=56 39.5 ms
--- www. ping statistics ---
3 packets transmitted, 3 received, 0% packet loss, time 2000ms
rtt min/avg/max/mdev = 39.576/41.204/44.262/2.176 ms
rtt min/avg/max/mdev = 39.576/41.204/44.262/2.176 ms

A ping speed test response, is timed at 39.7 ms.

Server Setup
Date:--
Server:Apache
Expires:--
Pragma:no-cache
Set-Cookie:--
Set-Cookie:--
Set-Cookie:--
Last-Modified:--
Vary:Accept-Encoding
Content-Length:12974
Content-Type:text/html