![](http://www.img-urlm.com/i/msprojects.co.uk.jpg)
Msprojects.co.uk
Msprojects is ranked 15,709,799 in the United Kingdom. 'MS Projects.'
15,709,799Rank in United Kingdom
--Worldwide Rank
Monthly pages viewed | < 300 | |
Monthly visits | < 300 | |
Value per visitor | -- | |
Estimated worth | £342.56 | |
External links | 2 | |
Number of pages | 15 |
Last Updated: 06/04/2018 . Estimated data, read disclaimer.
www.Msprojects.co.uk
ServerServer Location | |
Heart Internet Network England United Kingdom 54.224224, -3.901133 |
Its 2 nameservers are ns2.mainnameserver.com, and ns.mainnameserver.com. It is hosted by Heart Internet Network England, using Apache/2 web server. The site is programmed for PHP/5.2.17.
IP: 79.170.40.227
Powered by: PHP/5.2.17
Web Server: Apache/2
Encoding: utf-8
PING www. (79.170.40.227) 56(84) bytes of data. | |
64 bytes from web227.extendcp.co.uk (79.170.40.227): icmp_seq=1 ttl=52 | 99.7 ms |
64 bytes from web227.extendcp.co.uk (79.170.40.227): icmp_seq=2 ttl=52 | 99.8 ms |
64 bytes from web227.extendcp.co.uk (79.170.40.227): icmp_seq=3 ttl=52 | 99.6 ms |
--- www. ping statistics --- | |
3 packets transmitted, 3 received, 0% packet loss, time 2000ms | |
rtt min/avg/max/mdev = 99.644/99.750/99.868/0.273 ms | |
rtt min/avg/max/mdev = 99.644/99.750/99.868/0.273 ms |
A ping to the server is timed at 99.7 ms.
Server Setup | |
Date: | -- |
---|---|
Server: | Apache/2 |
X-Powered-By: | PHP/5.2.17 |
P3P: | -- |
Expires: | -- |
Cache-Control: | no-store, no-cache, must-revalidate, post-check=0, pre-check=0 |
Pragma: | no-cache |
Set-Cookie: | -- |
Last-Modified: | -- |
Transfer-Encoding: | chunked |
Content-Type: | text/html; charset=utf-8 |